Course title | |||||
山地保全・砂防計画学実習 [Practice on Montain Conservation and Erosion Control Planning] | |||||
Course category | Requirement | Credit | 2 | ||
Department | Year | 3~ | Semester | 1st | |
Course type | 1st | Course code | 01RN3308 | ||
Instructor(s) | |||||
白木 克繁, 五味 高志 [SHIRAKI Katsushige, GOMI Takashi] | |||||
Facility affiliation | Faculty of Agriculture | Office | afjgxte/L1151 | Email address |
Course description |
This class deals with practices of erosion control, protection of slope and basic hydrology. For the torpgraphical analysis, students analyze some topographical features with topographic map. Students also learn the condition of slope stability with force momentum alaysis. This class has intesive lecture at the FM Kusaki and Nikko area. |
Expected Learning |
Numerical analysis for the statistic of hydrology on rainfall expectation and maximum discharge amount. Slope stability with safety factor. Please refer to the curriculum map on the University's website (three policies) for diploma policy perspectives https://www.tuat.ac.jp/campuslife_career/campuslife/policy/ |
Course schedule |
Topographical analysis. Statistic of rainfall expectation and discharge. Slope stability at a landslide area. We have also intensive lecture at a field. plan for 2020 Schedule and content April 14 1st Project Topographic Measurement (Shiraki 1) April 21 1st Project Topographic Measurement (Shiraki 2) April 28, 2nd issue, Analysis of the probability of occurrence of annual maximum rainfall (Shiraki 3) May 12 Third report Estimation of Area Rainfall (Shiraki 4) May 26-28, Sixth report: Practice with FM plants and field visits (Shiraki / Gomi) June 2nd Sixth report: Summary of FM plant training (Gomi 1) June 9 4th report: Estimating the hyetograph from the probable daily rainfall (Shiraki 5) June 13 (Sat.) 5th report: Estimation of hydroglov from hyetograph (Shiraki 6) June 16 Sixth report Settlement of Sabo Dam Installation Plan and Calculation of Sediment Volume (Gomi 2) June 23 7th report: Basin-baased sediment management plan (Gomi 3) June 30 7th report: Basin-baased sediment management plan (Gomi 4) July 7 Eighth reportDesign of gravity concrete dam (Gomi 5) July 14 Eighth report Design of gravity concrete dam (Gomi 6) July 21 Ninth report Debris Flow Calculation and Sabo Dam Placement Plan (Gomi 7) |
Prerequisites |
Please perform preparations, review (out-of-class learning). The required study time is based on the standard hours of the university. |
Required Text(s) and Materials |
References |
Assessment/Grading |
Students must attend the field experiment works. Report results are scored for gradings. |
Message from instructor(s) |
Course keywords |
Office hours |
Remarks 1 |
Remarks 2 |
Related URL |
Lecture Language |
Japanese |
Language Subject |
Last update |
3/19/2020 11:13:07 AM |